Skip to content
Advantage Concrete logo

Homeowner guide

Advantage ConcreteWhat Replacing Old Front Steps Involves

Front steps take a lot of wear. Over time they crack, chip, sink or end up with one step that's a different height from the rest. Replacing them is a contained job, but it touches the main way into the house, so it's worth knowing what's involved. Here's how it usually goes.

Deciding what's being replaced

The first step is agreeing exactly what's being replaced. That could be the steps alone, the steps and the landing at the top, or the steps along with a section of the walk at the bottom. Where the new concrete starts and stops matters, because it sets where the new work meets the old.

If the walk at the bottom is cracked or sits at the wrong height, it can make sense to replace a section of it at the same time so the first step comes out even.

Laying out the new flight

Before anything is broken out, the total rise from the bottom surface to the top surface is measured. That's divided into equal steps, and the total run is divided into equal treads. The goal is a flight where every step is the same height and depth.

If the old steps were uneven, this is when the layout corrects it. Why Every Step Should Be the Same Height explains why that matters so much.

Breaking out the old steps

The old steps are broken out down to the ground. Concrete steps can be solid or built over fill, and older steps sometimes have layers of patching. All of it comes out, and the broken concrete is hauled away. Edges of any concrete that's staying, like the walk or a landing, are cut cleanly so the new steps have a sound edge to meet.

Preparing the ground

Once the old steps are gone, the ground underneath is checked. Soft or loose ground is dealt with and the base is prepared and compacted, so the new steps sit on firm support. Steps that sank in the past usually did so because the ground under them settled, so this stage matters.

Forms and reinforcement

Steps are built from forms, one riser at a time. The forms set the height of each step, the depth of each tread and the overall shape of the flight. Reinforcement is placed inside to hold the steps together and tie them into the landing or walk where needed.

If you plan to add a handrail later, this is the time to say so, so the layout leaves room for it beside the steps.

Pouring and finishing

The concrete is placed into the forms and worked into every step. Edges are rounded slightly so they're less likely to chip. The treads get a broom finish for grip, which matters on steps that get wet. Once the concrete has set enough, the forms are removed and the faces of the steps are finished.

Tying in at the top and bottom

The bottom step meets the walk or driveway and the top step meets the landing, porch or door. Both meeting points are planned so the surfaces meet cleanly at the right height. Water should run off the landing and away from the door, not toward it. Making Steps, Landings and Walkways Meet Cleanly covers this in more detail.

Getting in and out while the steps are new

If the steps are the main way into the house, you'll need another route while they're being replaced and while the new concrete cures. A back door, a side door or a garage entry usually works. It's worth planning this before the work starts, and letting anyone who visits or delivers know.

You'll be told when the new steps can take foot traffic.

What to expect from the finished steps

New steps won't match older concrete beside them exactly in color. Fresh concrete starts out a different shade and tones down gradually as it weathers. Fine shrinkage cracks can appear in any concrete, even when the work is done properly.

A quick checklist

Before the work starts, it's worth having settled:

  • Exactly what's being replaced: steps, landing, part of the walk
  • The layout, with every step the same height and depth
  • Whether room should be left for a handrail
  • The finish on the treads
  • Another way in and out of the house during the work

Getting started

Tell me about the job and include photos of the steps from the front and the side. The free estimate covers breaking out the old steps, laying out and forming the new ones and tying them into the walk and landing. Concrete Stairs has more on the work.

Driveway base with forms up and reinforcement going in before the pour

Tell me about the job

The estimate is free, with no pressure and no obligation. Send the form and you'll hear back about your free estimate.

What happens next

  1. 1You send the form
  2. 2You hear back about the job
  3. 3You get a free estimate
  4. 4You decide

Request Your Free Estimate

Your details are used only to reply to your request. See the Privacy Policy.

(650) 532-8594Free Estimate